This is architecture and design at its best! First constructed at the start of the twentieth century, the Cineteca Matadero was used as an abattoir and livestock market for around 85 years, but is now renovated to accomodate two cinema screens, a film studio, an archive and a terrace for outdoor screenings.
When architects and designers are called in to redesign a space that already exists for a specific reason and their goal is to reinvent that space for an entirely different use, professionals are faced with a duality of responsibility and potential. In order to respect what once was and bring truth and beauty to the space that is without time or purpose, the task at hand becomes visceral. Questions arise as to how we want people to feel in this space. How can this space envelop the senses and become functional in its new incarnation while retaining its inherent beauty?
These questions emerged when churtichaga+quadra salcedo (ch+qs) architects commenced on their project to turn an old slaughterhouse in Legazpi, Madrid into a public cinema center. Their imagination would become their guide to tie in the past with the present and the raw emotion with the practical. The public cinema center is a huge complex made up of several connecting buildings, housing a film archive, a film and television studio, offices, two cinemas, a canteen and a summer film patio. It’s pure magic if you ask us!
Credits:
Project name: Cinema Center in Matadero de Legazpi
Location: Matadero de Legazpi, Madrid, Spain
Program: Refurbishment and conversion of an old slaughterhouse into a public cinema center housing a film archive, film and television studio, two cinemas, offices, canteen, and summer film patio
Area: Built-up Area: 2.688 m2
Year: Design: 2009 • Completion: 2011
Cost: 4.104.843 €
Client: Madrid City Council
Project by: churtichaga+quadra salcedo architects
Team: Principal Designer: Josemaria de Churtichaga • Project Design Team: Mauro Doncel Marchán, Natanael López Pérez • Building Design Team: Leticia López de Santiago
Others: Contractor: Edhinor • Quantity Surveyor: Joaquín Riveiro Pita, Martín Bilbao Bergantiños • Structural Surveyor: Euteca • Facilities Surveyor: Úrculo Ingenieros Consultores
Images: Fernando Guerra, FG+SG Architectural Photography























2 comments
Cinema Center Madrid | iGNANT says:
Aug 17, 2012
[...] images © churtichaga+quadra salcedo (ch+qs) architects | Via: Hypenotice [...]
Cinema Center – จากโรงฆ่าสัตว์กลายเป็นหอภาพยนตร์ [architecture] | POPpaganda.net says:
Dec 21, 2012
[...] [via HypeNotice] [...]